Bid Supplement for Design and Build Scheme Infrastructure Project: Construction of Electrical Distribution System (With Genset and 2)
- Hits: 5112
INVITATION TO BID - DESIGN AND BUILD SCHEME INFRASTRUCTURE PROJECT: CONSTRUCTION OF DORMITORY BUILDING II
- Hits: 5432
Read more: DESIGN AND BUILD SCHEME INFRASTRUCTURE PROJECT: CONSTRUCTION OF DORMITORY BUILDING II
INVITATION TO BID - DESIGN AND BUILD SCHEME INFRASTRUCTURE PROJECT: CONSTRUCTION OF ELECTRICAL DISTRIBUTION SYSTEM (WITH GENSET AND 2 TRANSFORMERS
- Hits: 5180
Read more: Construction Of Electrical Distribution System (With Genset And 2 Transformers)
During the Earth Hour, the PSHS-MRC switched off all lights during this global "lights-out" event. The said activity was done to show support in protecting our planet and fighting climate change. Activity ended at about 9:30 PM, March 24, 2018.
- Hits: 3918