Print
BID SUPPLEMENT for DESIGN AND BUILD SCHEME INFRASTRUCTURE PROJECT: SITE DEVELOPMENT PHASE III (CONSTRUCTION OF ROAD NETWORK, COVERED WALKWAYS, AND SLOPE PROTECTION)
Supporting documents:
COVERED PATH WALK OPTION 2 FOR DORM 2 TO PROPOSED ACAD 2 BUILDING
03 Revised PBD Site Dev Phase III
PHASE -3 SITE DEV'T LAYOUT PLAN 2
Revised TOR - Site Dev. Phase III (Road Network Covered Pathways Slope Protection)
Published: 20 February 2018
Created: 20 February 2018
Hits: 4402