BID SUPPLEMENT for DESIGN AND BUILD SCHEME INFRASTRUCTURE PROJECT: SITE DEVELOPMENT PHASE III (CONSTRUCTION OF ROAD NETWORK, COVERED WALKWAYS, AND SLOPE PROTECTION)

Supporting documents: